|
14' Treated Pine Single Roof Octagon Gazebo Shown w/ Optional Cedar Shingles, No Floor and No Bottom Railings
|
|
0' Treated Pine Octagon Double Roof Gazebo shown with No Deck, No Railings, Decorative Braces, Top Railing Sections, Cupola, Eagle Weathervane (58" Verdigris Copper), Cypress Tongue and Groove Ceiling, and Cedar Tone Stain/Sealer,
|
|
12 x 12 Treated Pine Rectangle Gazebo shown with Standard Treated Pine Decking, No Railings, 6x6 Posts, No Top Railings, Cedar Shake Shingles, No Cupola, Textured Black Fan with 22" Green Oval Blades,and Customer Provided Paint and Steps.
|
|
16' x 20' Treated Pine Rectangular Gazebo shown with no railings, 6 posts, laminated header beams, Cedar Shake shingles, 6:12 pitch roof, and 2 coats of cedar stain sealer.
|
|
60'x 100' Treated Pine Double Roof Gazebo shown with No Deck, No Railings, Standard Braces, 6/12 Pitch Roof, Rustic Cedar Asphalt Shingles, Custom Paint, 84" Head Clearance, and 8x8 Laminated Posts.
|
|
Custom 14x18 Treated Pine Rectangular Double Roof Gazebo with no floor, no railings, larger custom posts, and Cedar Shake shingles, plus two custom Treated Pine 2 Beam Pergolas, attached.
|
|
12' treated pine belle roof octagon gazebo shown with no railing, no deck, cupola, and Rustic Cedar asphalt shingles.
|
|
12' x 12' treated pine double roof gazebo shown with no railing, no deck, Riviera Red asphalt shingles, and cupola.
|
|
18' treated pine double roof octagon gazebo shown with no deck, no railings, cupola, and Gallery Blue metal roof.
|
|
|
|
If you would like a more open look, or prefer more entrances, select "No Railings". We typically recommend at least one of the railing options (top or bottom), to maintain our high lateral strength and wind load (85-110mph standard. 140mph with Hurricane Package). A Project Advisor will be able to help you with this information.
Larger rectangular gazebos should keep railing sections in corners for stability.
If you need a gazebo with partial rails (e.x. - 3 railing sections) select the railing style you would like and make sure to tell a Project Advisor when they call you with the Freight Quote.
|