|
Example Footprint Drawing
|
|
|
|
Site Prep / Footprint Drawings
Our Site Prep / Footprint Drawings are generally needed for new construction, or when installing on concrete abutments, or wooden decks. The drawings will distinguish where the beams or floor supports of the bridge will be located for footer or base planning. These drawings can be used with a custom designed bridge although we do recommend our Spec Drawings which are more detailed and would need to be discussed with a Project Advisor. For any customizations, we do request that these drawings are approved by the customer and confirmed by the Project Advisor before moving into production.
Please allow 3-5 business days for these drawings and note that these lead times may vary depending on the season.
|